Replacement Residence 7

Flush Casement Windows

Replacing traditional windows with modern Residence 7 flush casement windows while preserving the home’s character

Project: Replace Old Windows with Residence 7 Flush Casement Windows

Location: Nantwich, Cheshire

Date: Winter 2024-2026

Installation Time: 3-4 Windows per day

Residence 7 Windows Nantwich

Before & After the Replacement Windows

Before Shot of Residence 7 Windows After Shot of Residence 7 Windows

The Customer’s Requirement

The homeowner lives in a large country house in Burland, near Nantwich, with numerous windows across the property.

Rather than replacing every window at once, the customer preferred to complete the project in stages, allowing the upgrades to be carried out gradually while maintaining the character of the home and avoiding major disruption.

The goal was to install modern, energy-efficient windows that would retain the traditional appearance of the property, including the distinctive leaded glass pattern already present in the existing windows.

The Solution

We recommended installing Residence 7 flush casement windows, a premium window system designed to replicate the appearance of traditional timber windows while providing modern performance, durability, and improved insulation.

For this stage of the project, the new windows were installed in classic white, featuring diamond lead detailing to recreate the style of the original glazing.

  • Window system: Residence 7 flush casement windows
  • Colour: White
  • Glazing style: Diamond lead design to match the original windows
  • Hardware: Upgraded teardrop handles
  • Installation rate: Typically 3–4 windows per day depending on window size
Residence 7 Windows Nantwich

The flush casement design means the window sash sits perfectly flush within the frame, helping to maintain the traditional look of the property.

Our Approach

Due to the large number of windows throughout the property, the project has been completed over several visits to suit the homeowner’s preferences.

Working in stages allows the customer to upgrade their windows without the disruption of a full-house installation all at once.

So far the installation has been carried out across three stages, with a final fourth stage planned to complete the remaining six windows.

During each phase, the existing windows are carefully removed before the new Residence 7 flush casement windows are fitted, ensuring a clean finish both internally and externally.

The diamond lead glazing pattern was chosen specifically to replicate the style of the original windows, ensuring the replacements blend seamlessly with the character of the house.

You can read more about Flush fit windows in this section.

The Finished Installation

The newly installed Residence 7 flush casement windows retain the classic appearance of the property while providing the benefits of modern glazing technology.

With their flush external finish, diamond lead glazing, and upgraded teardrop handles, the windows complement the traditional design of this large country home perfectly.

Once the final stage of installation is complete, the property will benefit from a full set of high-performance windows that combine traditional aesthetics with improved energy efficiency and long-term durability.